Get my price
White quartz island facing gray cabinets with stacked wall ovens, the living room beyond

About

The price first, the visit later

An independent kitchen remodeling service for Loveland and the towns along the river.

  1. Priced up front

    Added up from what Cincinnati trades are paid, current material costs, permits and a normal margin.

  2. Designed by you

    Build the room in 3D. Every pick changes the number in front of you.

  3. Built by licensed pros

    A licensed local contractor confirms the price and does the work.

Why the price comes first

Same kitchen, quotes all over the map

Ask three contractors to price one kitchen and the numbers rarely line up. One lands at half of the others. One sits 20% above them. Not one of them says where the difference went.

Plenty of quotes start as a gut feeling or a copy of a form that went to four other houses that week. A real price means looking up what local electricians, plumbers and tile setters earn right now, then adding the cabinets, counters and appliances you picked. It takes hours, so most people skip it.

We did the slow part. The price tool builds your kitchen one line at a time from Cincinnati wages, current material costs and permit fees, and it shows you every line. You pay a fair number and the contractor earns one.

How it works

From price to finished kitchen

  1. Get the number

    Tell the tool the size of your kitchen and what is changing: cabinets, counters, an island, appliances, flooring, lighting or paint. Add your ZIP. You get three finish levels, each split into lines and built from Cincinnati trade wages.

    01

    About a minute

  2. Build the room in 3D

    Choose the shape closest to your kitchen, from one wall to a U with an island. Set the door style, color, hardware, counters, backsplash and floor, then spin the room around. The price moves with each choice.

    02

    A few minutes

  3. Have it confirmed

    A licensed local contractor visits, measures, checks what is inside the walls and confirms your number. That visit only happens when you request it.

    03

    When you say so

  4. Build it

    Permits are pulled and cabinets are ordered, which usually take 3 to 8 weeks to show up. A kitchen that keeps its layout is usually finished 4 to 8 weeks after work begins.

    04

    Often 4 to 8 weeks of work

Sage green island with open shelves beside a range wall, a jute runner on a wood floor

One minute, no visit

See your kitchen price

About a minute. Your ZIP, your finishes, your kitchen in 3D.